PROJECTS
Current Projects
The Davisville Condo
Toronto, ON
Client: Rockport
​
Contracted to build 1 level underground level of parking and 13 storeys concrete condo above.
Biblio Lofts
Toronto, ON
Developer/Builder: EMSA Construction Group Ltd.
​
8 Storey residential condo, contracted to form concrete structure including rebar installation for an 8-storey condominium with one level underground parking.
Jaguar Land Rover Dealership
Toronto, ON
General Contractor: Northway Construction Co. Ltd.
​
Form and place concrete/rebar to one level underground basement and main floor slab with ramp to underground service area. Place concrete on metal deck to upper steel structure levels. Place and finish new ramp into neighbouring existing BMW Dealership with underpinning existing foundation to provide new service door opening.
Upcoming Projects
The Village of Stouffville
Stouffville, ON
General Contractor: Norlon Builders
​
Phase 1 of 3 buildings. Form and concrete/rebar placing to basement, core walls to roof and place concrete topping on core slabs complete with precast slab beam infills.
Canadian Tire
Toronto, ON
Construction Management: Traugott Building Contractors Inc.
​
New retail building with 1 underground parking level and 2 above ground retail/office building. Includes a garden centre, auto service centre, underground parking, retail area with warehouse and loading area. Contracted to form and place concrete/rebar for the building structure.
Completed Projects
Reserve Condos
Mississauga, ON
Client: Queens Corp
Contracted to build a 97,000sqft underground parking structure with 7 metal structure stacked town homes above. Placed/finished concrete on deck all levels and constructed all retaining and planter walls.
Usocial Parking Garage
Richmond Hill, ON
Client: Signature Homes
​
Contracted to build two storey underground parking structure to this modern Urban Townhouse complex with 650 linear feet crash wall at CN Rail side of project.
Canvas On The Rouge
Markham, ON
Project Managers/Client: Flato Canvas on the Rouge
​
Contracted to construct a two storey split level underground parking structure to this six storey metal Building above grade.
Genesis On The Park
Brampton, ON
General Contractor: Wilkinson/Leeswood
​
Contracted to construct a three storey split level underground parking structure and 3 concrete cores to roof of this nine storey metal building above grade. Placed and finished Concrete on metal deck to all levels.
Bayfield Tower
Barrie, ON
Client: Bost Group
​
Contracted to build a 10 storey Concrete structure rental condominium.
8 HAUS Boutique Condo
Toronto, ON
Client: Riise Building
​
Contracted to build two level underground parking structure on raft slab with 8 levels concrete structure above ground to roof.
Eastside Village
Toronto, ON
Client: Mattamy Homes
​
Contracted to build a 74,000sqft parking structure with heated ramp, 5 townhouse blocks above the podium slab complete with buildings resting on foundation walls, retaining and curb walls on podium.
Kingsway Condominium
Etobicoke, ON
General Contractor: Harhay Construction
​
Contracted to construct a 9 storey concrete condominium with two levels underground parking, concrete cores, shear walls, slabs and curbs.
Macri Dixon Condominium
Milton, ON
Client: Mattmay Homes
​
Contracted to build a 90,000sqft underground parking structure with heated ramp with a seven storey iSpan metal building above grade.
2045 Steeles Ave West
Brampton, ON
Client: Tagar Family Trust Development
Contracted to build phase 1 (100,000sqft) of and underground parking structure and foundation to a banquet hall and hotel.
Landmark Towers
Barrie, ON
General Contractor: BOST Group
​
Contracted once again by repeat client to construct a 91,000sqft underground parking structure with 3 concrete towers above grade (1 at 4 storeys high, 1 at 6 storeys high and 1 at 9 storeys high).